日韩欧美亚洲 _ 欧美亚洲一区 _ 日本亚洲欧美 _ 亚洲精品欧美 国产白袜脚足J棉袜在线观看_亚洲熟妇av一区二区三区_久久天天躁狠狠躁夜_精品众筹模特私拍在线

單項選擇題

【案例分析題】

Ravi, like many project (1) , had studied the waterfall model of software development as the primary software life-cycle (2) . He has all set to use it for an upcoming project, his first assignment. However, Ravi found that the waterfall model could not be used because the customer wanted the software delivered in stages, something that implied that the system had to be delivered and built in (3) and not as (4) . The situation in many other projects is not very different. The real world rarely presents a problem in which a standard process, or the process used in a previous project, is the best choice. To be the most situation, an existing process must be (5) to the new problem. A development process, even after tailoring, generally cannot handle change requests. To accommodate change requests without losing control of the project, you must supplement the development process with a requirement change management process.

空白(3)處應選擇()

A.parts
B.modules
C.software
D.awhole

題目列表

你可能感興趣的試題

微信掃碼免費搜題